Please remember to protect and support our work.
Toll Collect Sachverstaendigenvertrag Dr.-Ing. Schwerhoff, 23 May 2003
From Wikileaks
Remember to protect and promote our work.
Unless otherwise specified the document described here:
- Was first publicly revealed by Wikileaks working with our source.
- At that time was classified, confidential, censored or otherwise withheld from the public.
- Is of political, diplomatic, ethical or historical significance.
- Any questions about this document's veracity are noted.
- The summary is approved by the editorial board.
Follow updates:
Secure talk join our chat.
To sponsor reportage of this document by mainstream journalists submit a targeted donation.
For press inquiries, see our media kit.
If you have similar or updated material ACT NOW.
For an explanation of the page you are looking at please look here.
Summary
(de) Das 24-seitige Dokument stellt den Vertrag zwischen der Toll Collect GmbH und dem Sachverstaendigenbuero Dr.-Ing. Schwerthoff dar, und beschreibt die Vereinbarung zu einem Gutachten des Mautsystems.
(en) The 24-paged PDF document presents the contract between Toll Collect GmbH and engineering bureau Dr.Ing. Schwerthoff. The contract covers the scope of an expert’s report created by the engineering bureau on the Toll Collect system.
Siehe auch / see also:
- Help us create a just and corruption free world.
- DOWNLOAD/VIEW FULL FILE FROM
- fastest (Sweden), current site, slow (US), Finland, Netherlands, Poland, Tonga, Europe, SSL, Tor
- Context
- Germany
- Company
- Toll Collect
Categories: Leaked files | 2009 | 2009-11 | Analysis requested | Germany | Company | Toll Collect | English